How to Show Utilities on a Residential Site Plan
Coordinate water, sewer, septic, electric, gas, communications, wells, meters, and service clearances on a preliminary residential site plan.
Separate known, mapped and proposed information
Identify existing mains, service stubs, meters, poles, transformers, wells, septic components and easements with their sources. Public maps and utility-marking services have specific purposes and accuracy limits. Use distinct line styles or labels for existing, proposed and approximate features.
Coordinate gravity-dependent systems
Sanitary sewer and storm drainage need elevation relationships, slope and connection information. A connection visible in plan view may be too high, too low or blocked. Septic systems require suitable treatment and reserve areas with setbacks from buildings, wells, boundaries and other features.
Protect equipment access and clearances
Meters, transformers, tanks, cleanouts, hydrants, backflow equipment, wells and mechanical units need provider-specific working space and access. Keep them out of vehicle conflicts and grading transitions. Architecture should provide appropriate wall and room locations for the service entry.